Accessibility Statement Skip Navigation
  • Resources
  • Investor Relations
  • Journalists
  • Agencies
  • Client Login
  • Send a Release
Return to PR Newswire homepage
  • News
  • Products
  • Contact
Search
When typing in this field, a list of search results will appear and be automatically updated as you type.

Searching for your content...

No results found. Please change your search terms and try again.
  • News Releases view all

    • News in Focus
        • Browse News Releases

        • All News Releases
        • All Public Company
        • English-only
        • News Releases Overview

        • Multimedia Gallery

        • All Multimedia
        • All Photos
        • All Videos
        • Multimedia Gallery Overview

        • Trending Topics

        • All Trending Topics
    • Business & Money
        • Auto & Transportation

        • Aerospace, Defense
        • Air Freight
        • Airlines & Aviation
        • Automotive
        • Maritime & Shipbuilding
        • Railroads and Intermodal Transportation
        • Supply Chain/Logistics
        • Transportation, Trucking & Railroad
        • Travel
        • Trucking and Road Transportation
        • Auto & Transportation Overview

        • View All Auto & Transportation

        • Business Technology

        • Blockchain
        • Broadcast Tech
        • Computer & Electronics
        • Computer Hardware
        • Computer Software
        • Data Analytics
        • Electronic Commerce
        • Electronic Components
        • Electronic Design Automation
        • Financial Technology
        • High Tech Security
        • Internet Technology
        • Nanotechnology
        • Networks
        • Peripherals
        • Semiconductors
        • Business Technology Overview

        • View All Business Technology

        • Entertain­ment & Media

        • Advertising
        • Art
        • Books
        • Entertainment
        • Film and Motion Picture
        • Magazines
        • Music
        • Publishing & Information Services
        • Radio & Podcast
        • Television
        • Entertainment & Media Overview

        • View All Entertain­ment & Media

        • Financial Services & Investing

        • Accounting News & Issues
        • Acquisitions, Mergers and Takeovers
        • Banking & Financial Services
        • Bankruptcy
        • Bond & Stock Ratings
        • Conference Call Announcements
        • Contracts
        • Cryptocurrency
        • Dividends
        • Earnings
        • Earnings Forecasts & Projections
        • Financing Agreements
        • Insurance
        • Investments Opinions
        • Joint Ventures
        • Mutual Funds
        • Private Placement
        • Real Estate
        • Restructuring & Recapitalization
        • Sales Reports
        • Shareholder Activism
        • Shareholder Meetings
        • Stock Offering
        • Stock Split
        • Venture Capital
        • Financial Services & Investing Overview

        • View All Financial Services & Investing

        • General Business

        • Awards
        • Commercial Real Estate
        • Corporate Expansion
        • Earnings
        • Environmental, Social and Governance (ESG)
        • Human Resource & Workforce Management
        • Licensing
        • New Products & Services
        • Obituaries
        • Outsourcing Businesses
        • Overseas Real Estate (non-US)
        • Personnel Announcements
        • Real Estate Transactions
        • Residential Real Estate
        • Small Business Services
        • Socially Responsible Investing
        • Surveys, Polls and Research
        • Trade Show News
        • General Business Overview

        • View All General Business

    • Science & Tech
        • Consumer Technology

        • Artificial Intelligence
        • Blockchain
        • Cloud Computing/Internet of Things
        • Computer Electronics
        • Computer Hardware
        • Computer Software
        • Consumer Electronics
        • Cryptocurrency
        • Data Analytics
        • Electronic Commerce
        • Electronic Gaming
        • Financial Technology
        • Mobile Entertainment
        • Multimedia & Internet
        • Peripherals
        • Social Media
        • STEM (Science, Tech, Engineering, Math)
        • Supply Chain/Logistics
        • Wireless Communications
        • Consumer Technology Overview

        • View All Consumer Technology

        • Energy & Natural Resources

        • Alternative Energies
        • Chemical
        • Electrical Utilities
        • Gas
        • General Manufacturing
        • Mining
        • Mining & Metals
        • Oil & Energy
        • Oil and Gas Discoveries
        • Utilities
        • Water Utilities
        • Energy & Natural Resources Overview

        • View All Energy & Natural Resources

        • Environ­ment

        • Conservation & Recycling
        • Environmental Issues
        • Environmental Policy
        • Environmental Products & Services
        • Green Technology
        • Natural Disasters
        • Environment Overview

        • View All Environ­ment

        • Heavy Industry & Manufacturing

        • Aerospace & Defense
        • Agriculture
        • Chemical
        • Construction & Building
        • General Manufacturing
        • HVAC (Heating, Ventilation and Air-Conditioning)
        • Machinery
        • Machine Tools, Metalworking and Metallurgy
        • Mining
        • Mining & Metals
        • Paper, Forest Products & Containers
        • Precious Metals
        • Textiles
        • Tobacco
        • Heavy Industry & Manufacturing Overview

        • View All Heavy Industry & Manufacturing

        • Telecomm­unications

        • Carriers and Services
        • Mobile Entertainment
        • Networks
        • Peripherals
        • Telecommunications Equipment
        • Telecommunications Industry
        • VoIP (Voice over Internet Protocol)
        • Wireless Communications
        • Telecommunications Overview

        • View All Telecomm­unications

    • Lifestyle & Health
        • Consumer Products & Retail

        • Animals & Pets
        • Beers, Wines and Spirits
        • Beverages
        • Bridal Services
        • Cannabis
        • Cosmetics and Personal Care
        • Fashion
        • Food & Beverages
        • Furniture and Furnishings
        • Home Improvement
        • Household, Consumer & Cosmetics
        • Household Products
        • Jewelry
        • Non-Alcoholic Beverages
        • Office Products
        • Organic Food
        • Product Recalls
        • Restaurants
        • Retail
        • Supermarkets
        • Toys
        • Consumer Products & Retail Overview

        • View All Consumer Products & Retail

        • Entertain­ment & Media

        • Advertising
        • Art
        • Books
        • Entertainment
        • Film and Motion Picture
        • Magazines
        • Music
        • Publishing & Information Services
        • Radio & Podcast
        • Television
        • Entertainment & Media Overview

        • View All Entertain­ment & Media

        • Health

        • Biometrics
        • Biotechnology
        • Clinical Trials & Medical Discoveries
        • Dentistry
        • FDA Approval
        • Fitness/Wellness
        • Health Care & Hospitals
        • Health Insurance
        • Infection Control
        • International Medical Approval
        • Medical Equipment
        • Medical Pharmaceuticals
        • Mental Health
        • Pharmaceuticals
        • Supplementary Medicine
        • Health Overview

        • View All Health

        • Sports

        • General Sports
        • Outdoors, Camping & Hiking
        • Sporting Events
        • Sports Equipment & Accessories
        • Sports Overview

        • View All Sports

        • Travel

        • Amusement Parks and Tourist Attractions
        • Gambling & Casinos
        • Hotels and Resorts
        • Leisure & Tourism
        • Outdoors, Camping & Hiking
        • Passenger Aviation
        • Travel Industry
        • Travel Overview

        • View All Travel

    • Policy & Public Interest
        • Policy & Public Interest

        • Advocacy Group Opinion
        • Animal Welfare
        • Congressional & Presidential Campaigns
        • Corporate Social Responsibility
        • Domestic Policy
        • Economic News, Trends, Analysis
        • Education
        • Environmental
        • European Government
        • FDA Approval
        • Federal and State Legislation
        • Federal Executive Branch & Agency
        • Foreign Policy & International Affairs
        • Homeland Security
        • Labor & Union
        • Legal Issues
        • Natural Disasters
        • Not For Profit
        • Patent Law
        • Public Safety
        • Trade Policy
        • U.S. State Policy
        • Policy & Public Interest Overview

        • View All Policy & Public Interest

    • People & Culture
        • People & Culture

        • Aboriginal, First Nations & Native American
        • African American
        • Asian American
        • Children
        • Diversity, Equity & Inclusion
        • Hispanic
        • Lesbian, Gay & Bisexual
        • Men's Interest
        • People with Disabilities
        • Religion
        • Senior Citizens
        • Veterans
        • Women
        • People & Culture Overview

        • View All People & Culture

    • Explore Our Platform
    • Plan Campaigns
    • Create with AI
    • Distribute Press Releases
    • Report Results
    • Amplify Content
    • All Products
    • General Inquiries
    • Editorial Bureaus
    • Partnerships
    • Media Inquiries
    • Worldwide Offices
    • Hamburger menu
    • PR Newswire: news distribution, targeting and monitoring
    • Send a Release
      • ALL CONTACT INFO
      • Contact Us

        888-776-0942
        from 8 AM - 10 PM ET

    • Searching for your content...

      No results found. Please change your search terms and try again.

      News Releases

      view all
      Close menu
    • News
    • Products
    • Contact
      • Send a Release
      • Client Login
      • Resources
      • Blog
      • Journalists
      • RSS
      • 3 News in Focus
      • 5 Business & Money
      • 5 Science & Tech
      • 5 Lifestyle & Health
      • 1 Policy & Public Interest
      • 1 People & Culture
      • Send a Release
      • Client Login
      • Resources
      • Blog
      • Journalists
      • RSS
      • Explore Our Platform
      • Plan Campaigns
      • Create with AI
      • Distribute Press Releases
      • Report Results
      • Amplify Content
      • All Products
      • Send a Release
      • Client Login
      • Resources
      • Blog
      • Journalists
      • RSS
      • General Inquiries
      • Editorial Bureaus
      • Partnerships
      • Media Inquiries
      • Worldwide Offices
      • Send a Release
      • Client Login
      • Resources
      • Blog
      • Journalists
      • RSS
      Close submenu (News in Focus) News in Focus
      • Browse News Releases
      • Multimedia Gallery
      • Trending Topics
      Close submenu (Business & Money) Business & Money
      • Auto & Transportation
      • Business Technology
      • Entertain­ment & Media
      • Financial Services & Investing
      • General Business
      Close submenu (Science & Tech) Science & Tech
      • Consumer Technology
      • Energy & Natural Resources
      • Environ­ment
      • Heavy Industry & Manufacturing
      • Telecomm­unications
      Close submenu (Lifestyle & Health) Lifestyle & Health
      • Consumer Products & Retail
      • Entertain­ment & Media
      • Health
      • Sports
      • Travel
      Close submenu (Policy & Public Interest) Policy & Public Interest
      • Policy & Public Interest
      Close submenu (People & Culture) People & Culture
      • People & Culture

      Montage Announces Updated Feasibility Study at Koné Gold Project

      Montage Gold Corp Logo (CNW Group/Montage Gold Corp)

      News provided by

      Montage Gold Corp

      Jan 16, 2024, 06:30 ET

      Share this article

      Share this article


      After-Tax NPV of $1.1B and 31% IRR and Two New Satellites to be Advanced

      VANCOUVER, BC, Jan. 16, 2024 /PRNewswire/ -- Montage Gold Corp. ("Montage" or the "Company") (TSXV: MAU) (OTCPK: MAUTF) is pleased to announce the results of the Updated Definitive Feasibility Study (the "UFS" or the "Study") for the Koné Gold Project ("Koné Gold Project", "Project", or "KGP") located in Côte d'Ivoire, which now incorporates ore from the Gbongogo Main satellite deposit. The UFS was prepared by Lycopodium Minerals Pty Ltd. in accordance with Canadian Securities Administrators' National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). Please note that all financial figures in this press release are in United States dollars, unless otherwise noted.

      Highlights

      • Significant Reserves and Production – A New Gold District in Côte d'Ivoire
        -  4.01Moz of Probable Mineral Reserves
        -  3.57Moz of gold produced over a 16-year mine life
        -  Years 1-3: Avg. annual production of 349,000 oz at 1.15g/t avg. head grade
        -  Years 1-8: Avg. annual production of 301,000 oz at 0.96g/t avg. head grade
        -  Peak production of 378,000 oz in year 3

      • Strong Financial Metrics – In an Increasing Cost Environment
        -  $1,089M after-tax NPV5% and 31% IRR at base case $1,850/oz gold price
        -  $1,456M after-tax NPV5% and 39% IRR at spot $2,050/oz gold price
        -  Years 1-3: Avg. AISC1 of $899/oz
        -  LOM AISC1 of $998/oz
        -  Capital payback period of 2.6 years

      • Optimizations Maintain Capital Efficiency – Further Improvements Expected
        -  Pre-production capital requirement of $712M (vs $544M from 2022 DFS)
        -  $126M reduction in sustaining capital vs 2022 DFS
        -  Net increase in LOM total capital requirements of 5% compared to 2022 DFS
        -  Several areas identified to optimize pre-production capital

      • Impact of Gbongogo Main Deposit
        -  Gbongogo Main represents 12% of Probable Reserves and contributes $350M in pre-tax net cash flow in first 3 years of operations
        -  Optimizes capital payback; demonstrates impact of satellite deposits
        -  Planned haul road opens 38km corridor for priority exploration

      • KGP Construction Planned for Q4 2024
        -  Permitting process ongoing with all requisite approvals expected in Q3 2024
        -  Project financing process underway

      • Drilling to Continue in January on Next Satellite Deposit Targets – Diouma North and Petit Yao
        -  Diouma North is located 2km south of Gbongogo Main and <500m from planned haul road
        -  Recent Diouma North drilling included: 17.45m at 2.75g/t, 11m at 2.21g/t and 14m at 2.16g/t
        -  Petit Yao is located 3km from planned haul road
        -  Previous Petit Yao results included: 12m at 4.15g/t, 6m at 10.82g/t, and 3m at 15.51g/t

      Rick Clark, Montage CEO commented,

      "The completion of the UFS for the Koné Gold Project is the culmination of a business plan of target identification, exploration, economic analysis, and development assessment and represents the hard work, dedication, and expertise since 2009 of what is now the Montage team. I am extremely proud of what this team has accomplished at the KGP since this opportunity was first recognized by Hugh Stuart (President of Montage) while investigating growth projects for Red Back Mining in 2008-09.

      "In the three years since Montage went public, we have evolved from an exploration company with a 1.5Moz Inferred Mineral Resource into a development company with Probable Mineral Reserves of +4Moz and total Indicated Mineral Resources of nearly 5Moz. The KGP is now positioned to become the largest gold mine in Côte d'Ivoire with an expected average gold production of 349,000 oz per year during the initial 3 years of operations at an AISC of less than $1,000/oz, leading to a short payback on capital of 2.6 years.

      "The primary objective of the UFS was to optimize the economics of the Koné Gold Project by incorporating higher grade tonnes from Gbongogo Main. This change has materially de-risked the financial parameters of the Project and demonstrates the significant impact of discovering higher grade satellite deposits within the broad 2,259 sq. km property package held 100% by Montage. We will now focus on repeating this success as we advance the next near-term satellite deposits within the KGP, notably Diouma North and Petit Yao, both of which are in close proximity to the planned haul road.

      "The success we have achieved to date with the Koné Gold Project highlights Côte d'Ivoire as a premier jurisdiction for gold exploration and development. The combination of the geological endowment of Côte d'Ivoire and the business focussed political will of the Government of Côte d'Ivoire, represents a formula for mining success. Côte d'Ivoire is a partner in every respect in the development of its natural resources and the Koné Gold Project is a perfect example of this. The construction of the KGP will be the largest investment in a gold project in Côte d'Ivoire to date and we look forward to working with the Government of Côte d'Ivoire to realize success for all stakeholders."

      A summary of operating and financial metrics from the UFS are presented in Table 1 below along with a comparison to the 2022 DFS. A summary model with annual projections over the project life has been included as Appendix 1 to this Release.

      Table 1 – UFS Summary Metrics

      Metrics

      Units

      UFS

      2022 DFS

      Pit Optimization Gold Price

      $/oz

      $1,550

      $1,250

      Financial Model Base Case Gold Price

      $/oz

      $1,850

      $1,600

      Life of Mine

      years

      16.0

      14.8

      Total Material Processed

      Mt

      174.3

      161.1

      Contained Gold (Probable Reserves)

      Moz

      4.01

      3.42

      Strip Ratio

      w:o

       1.18:1

      0.90:1

      Average Annual Mining Rate

      Mtpa

      42.4

      35.0

      Mill Throughput

      Mtpa

      11.0

      11.0

      Average Head Grade, first 3 years

      Au g/t

      1.15

      0.93

      Average Head Grade, first 8 Years

      Au g/t

      0.96

      0.81

      Average Head Grade, LOM

      Au g/t

      0.72

      0.66

      Processing Recovery, first 3 Years

      %

      89.6 %

      91.1 %

      Processing Recovery, first 8 Years

      %

      90.0 %

      90.3 %

      Processing Recovery, LOM

      %

      89.0 %

      89.3 %

      Total Gold Production, LOM

      Moz

      3.57

      3.06

      Average Gold Production, first 3 years

      koz/yr

      349

      285

      Average Gold Production, first 8 years

      koz/yr

      301

      255

      Average Gold Production, LOM

      koz/yr

      223

      207

      Mining Cost Per Tonne Mined, LOM

      $/t, mined

      $3.22

      $2.73

      Mining Cost Per Tonne Processed, LOM

      $/t, processed

      $6.68

      $5.20

      Processing Cost, LOM (incl. rehandle)

      $/t, processed

      $8.94

      $8.04

      G&A, LOM

      $/t, processed

      $0.98

      $0.93

      Royalties, LOM

      $/t, processed

      $2.84

      $1.97

      Total Operating Costs, LOM

      $/t, processed

      $19.83

      $15.89

      Average AISC, first 3 years

      $/oz

      $899

      $824

      Average AISC, LOM

      $/oz

      $998

      $933

      Initial Capital Expenditure

      $M

      $712

      $544

      Sustaining Capital (incl. Closure)

      $M

      $165

      $292

      Total LOM Capital (incl. Closure)

      $M

      $877

      $836

      NPV5%, pre-tax (100%)

      $M

      $1,437

      $992

      Pre-tax IRR

      %

      34.6 %

      39.6 %

      NPV5%, after-tax (100%)

      $M

      $1,089

      $746

      After-tax IRR

      %

      31.0 %

      34.8 %

      Payback Period

      years

      2.6

      2.7

      Details

      Koné Gold Project Overview

      The Koné Gold Project is located approximately 470km north-west of Abidjan, the commercial capital of Côte d'Ivoire. The Project comprises six exploration permits (PR262, PR748, PR842, PR879b, PR919 and PR920) covering 1,801 sq. km and two applications covering a further 456 sq. km, for a combined total of 2,259 sq. km.

      The communities of Fadiadougou and Batogo lie 5km east and west respectively of the Koné resource area and the village of Gbongogo is located 4km north-west of the Gbongogo Main resource. The village of Dolourogoukaha will be impacted by the development pf the Gbongogo Main pit and will be resettled outside the affected area. Beyond this, the Project area is largely devoid of habitation with subsistence farming and cashew plantations being the dominant land use.

      The nearest major centre is Séguéla, 80km to the south. The Project area is accessible year-round with an asphalt highway within 300m of the proposed plant location.

      Figure 1: Location of Koné Gold Project

      Drilling to Start in January at Next Satellite Deposit Targets

      Exploration during Q4 2023 focussed on continued assessment of the numerous targets within the KGP covered by the program in H1 2023 and several new areas of artisanal mining activity.

      A key priority area is Diouma-Gbongogo-Korotou shear zone (Figure 2), a 15km strike length of soil anomalism, artisanal mining and 9 targets drilled to some degree, with the Gbongogo Main pit and planned haul road located at the south end.

      In addition, Montage will be re-starting exploration at the Petit Yao target which sits 7km east of Koné and just 3km southeast of the planned haul road.

      Figure 2: Diouma-Gbongogo-Korotou Shear Zone and District Target Areas

      The Diouma North prospect is located 2km south of Gbongogo Main, and less than 500m from the planned haul road. As follow-up to reconnaissance and RC drilling in early 2023, Montage completed three diamond core holes, with highlight intercepts including: 14m at 2.16g/t from 58m (GBDDH062); and 17.45m at 2.74g/t from 79m and 11m at 2.21g/t from 127m (GBDDH064). Diamond drilling at Diouma will re-commence by the end of January with an initial core programme which, if successful, will be followed up with an RC programme with the aim of defining an initial resource by mid-2024. Results presented in Table 2 below represent intercepts that have intersected the targeted mineralized area. A complete set of previously unreleased results is included in Appendix 2 of this press release.

      Table 2: Highlight Drill Results from Diouma North

      Hole

      From

      To

      Length

      Au


      (m)

      (m)

      (m)

      g/t

      GBRC065*

      24

      47

      23

      1.43

      53

      75

      22

      1.55

      GBRC067*

      51

      59

      8

      7.39

      GBRC070*

      12

      24

      12

      2.61

      GBRC071*

      79

      94

      15

      3.84

      GBRC073

      7

      21

      14

      1.73

      GBDDH062

      58

      72

      14

      2.16

      GBDDH064

      78.85

      96.30

      17.45

      2.74

      127

      138

      11

      2.21

      * previously released intercepts.

      The Petit Yao target sits approximately 7km east of the Koné deposit and 3km southeast of the planned haul road. It was first identified in late 2019 by Montage geologists recognizing prospective volcanic rocks in an area previously assumed to be un-prospective. Drilling completed at Petit Yao includes 3,392m of RC and 681m of shallow aircore, with highlight intercepts shown in Table 3 below.

      Table 3: Highlight Drill Results from Petit Yao

      Hole

      From

      To

      Length

      Au


      (m)

      (m)

      (m)

      g/t

      MRCAC128*

      0

      12

      12

      4.15

      MRPYRC030A*

      37

      43

      6

      10.82

      MRPYRC039*

      28

      31

      3

      15.51

      MRPYRC049*

      35

      39

      4

      8.31

      * previously released intercepts.

      In H1 2022, an IP survey was completed over Petit Yao, which clarified a strong northwest trend to the underlying geology and has resulted in a re-interpretation which now extends over a strike of approximately 900m. This new interpretation will be drill tested in Q1 2024.

      Mineral Resources and Reserves Estimates

      Recoverable Mineral Resources were estimated for the Koné and Gbongogo Main deposits by Matrix Resource Consultants Pty Ltd. using Multiple Indicator Kriging ("MIK").

      Koné Deposit

      The Mineral Resource Estimate ("MRE") for the Koné deposit has been re-stated based on an optimal pit shell generated using cost inputs in line with the UFS and a gold price of $1,800/oz with an effective date of 19 December 2023.

      Table 4 shows the Indicated and Inferred Mineral Resource estimates at a range of cut-off grades.

      Table 4 – Koné Mineral Resource Estimate

      Cut-off Grade

      Indicated

      Inferred

      Au g/t

      Mt

      Au g/t

      Au Moz

      Mt

      Au g/t

      Au Moz

      0.1

      286

      0.50

      4.60

      37

      0.3

      0.36

      0.2

      229

      0.59

      4.34

      25

      0.5

      0.40

      0.3

      170

      0.70

      3.83

      16

      0.6

      0.31

      0.4

      130

      0.81

      3.39

      10

      0.7

      0.23

      0.5

      100

      0.92

      2.96

      7.0

      0.8

      0.18

      0.6

      78

      1.03

      2.58

      5.0

      0.9

      0.14

      0.7

      61

      1.14

      2.24

      3.0

      1.1

      0.11

      0.8

      47

      1.25

      1.89

      2.0

      1.2

      0.08

      Notes:

      1. The MRE is reported on a 100% basis and is constrained within an optimal pit shell generated at a gold price of US$1,800/ounce.
      2. The identified Mineral Resources are classified according to the "CIM" definitions of Indicated Mineral Resources and Inferred Mineral Resources.
      3. The MRE was prepared by Mr. Jonathon Abbott of Matrix Resource Consultants of Perth, Australia who is a Qualified Person as defined by NI 43-101.
      4. The estimate at 0.2g/t represents the base case or preferred scenario for Koné.
      5. Mineral Resources are reported inclusive of Mineral Reserves.
      6. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
      7. Figures are rounded to reflect the precision of the estimates.

      Gbongogo Main Deposit

      The Mineral Resource Estimate ("MRE") for the Gbongogo Main deposit is constrained within an optimal pit shell generated using cost inputs in line with the UFS and at a gold price of $1,800/oz with an effective date of 19 December 2023.

      Table 5 shows the Indicated and Inferred Mineral Resource estimates at a range of cut-off grades.

      Table 5 – Gbongogo Main Indicated Mineral Resource Estimate

      Cut-off Grade

      Indicated

      Au g/t

      Mt

      Au g/t

      Au Moz

      0.2

      15

      1.16

      0.56

      0.3

      14

      1.26

      0.57

      0.4

      12

      1.37

      0.53

      0.5

      11

      1.48

      0.52

      0.6

      9.9

      1.59

      0.51

      0.7

      8.8

      1.71

      0.48

      0.8

      7.8

      1.83

      0.46

      0.9

      6.9

      1.96

      0.43

      1.0

      6.1

      2.09

      0.41

      Notes:

      1. The MRE is reported on a 100% basis and is constrained within an optimal pit shell generated at a gold price of US$1,800/ounce.
      2. The identified Mineral Resources are classified according to the "CIM" definitions of Indicated Mineral Resources and Inferred Mineral Resources.
      3. The MRE was prepared by Mr. Jonathon Abbott of Matrix Resource Consultants of Perth, Australia who is a Qualified Person as defined by NI 43-101.
      4. The estimate at 0.5g/t represents the base case or preferred scenario for Gbongogo Main.
      5. Mineral Resources are reported inclusive of Mineral Reserves.
      6. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
      7. Figures are rounded to reflect the precision of the estimates.

      Combined Resources

      Table 6 shows the combined resources based on the preferred cut off grades for each deposit.

      Table 6 – Combined Resources

      Cut-off Grade

      Indicated

      Inferred

      Au g/t

      Mt

      Au g/t

      Au Moz

      Mt

      Au g/t

      Au Moz

      Koné 0.20 g/t

      229

      0.59

      4.34

      25

      0.5

      0.40

      Gbongogo Main 0.50 g/t

      11

      1.48

      0.52

      -

      -

      -

      Total

      240

      0.63

      4.87

      25

      0.5

      0.40

      Notes:

      1. Figures are rounded to reflect the precision of the estimates and include rounding errors.

      The Mineral Reserve estimate was prepared by Carci Mining Consultants Ltd., dated as of January 15, 2024 and is presented below in Table 7.

      Table 7 – Mineral Reserve Estimate

      Pit

      Classification

      Oxide

      Transition

      Fresh

      Total

      Mt

      Au

      g/t

      Au

      Moz

      Mt

      Au

      g/t

      Au

      Moz

      Mt

      Au

      g/t

      Au

      Moz

      Mt

      Au

      g/t

      Au

      Moz

      Koné South

      Probable

      9.6

      0.58

      0.18

      7.0

      0.60

      0.13

      145.3

      0.67

      3.18

      161.9

      0.67

      3.49

      Koné North

      Probable

      0.9

      0.47

      0.01

      0.4

      0.44

      0.01

      0.4

      0.51

      0.01

      1.9

      0.47

      0.03

      Gbongogo Main

      Probable

      0.7

      1.36

      0.03

      0.5

      1.09

      0.02

      9.4

      1.46

      0.44

      10.7

      1.43

      0.49

      Total

      Probable

      11.3

      0.63

      0.23

      7.9

      0.63

      0.16

      155.1

      0.73

      3.62

      174.3

      0.72

      4.01

      Notes:

      1. The Mineral Reserves are classified according to the "CIM" definitions.
      2. All Mineral Reserves were classified as Probable based on the Indicated Mineral Resource.
      3. The Mineral Reserve cut off grade range from 0.19 g/t to 0.49g/t based on a $1,550/oz gold price.
      4. The Mineral Reserve statement was prepared by Joeline McGrath of Carci Mining Consultants Ltd, who is a Qualified Person as defined by NI 43-101.
      5. The figures in this table are rounded to reflect the precision of the estimates and may include rounding errors.

      Updated Definitive Feasibility Study Overview

      The UFS is based on three open-pit gold deposits feeding a central gold processing facility (Figure 3). The Project will produce an average of 223,000 ounces of gold per year over the life of the mine. The initial life of the Project is 16.0 years. There is upside potential through regional exploration and identification of satellite pits similar to Gbongogo Main that could be mined and trucked to a central processing facility.

      Initial capital to fund construction and commissioning is estimated at $712.1 million with total capital estimated at $877.5 million over the LOM including closure costs. All-in sustaining costs1 are estimated at $899 per ounce during the first three years of the Project, well below the current industry average, and $998 per ounce over the life of the Project. Processing costs of $8.35/t position the Project to be able to take advantage of mining satellite pits identified through ongoing exploration.

      The financial analysis performed from the results of this UFS demonstrates the economic viability of the Koné Gold Project using the base case gold price assumption of $1,850 per ounce. This results in an after-tax net present value cashflow at a 5% discount rate (NPV5%) of $1,089 million and an after-tax IRR of 31.0% (both on a 100% basis) with a 2.6 year payback.

      The Company is highly confident that there are additional opportunities to further strengthen the Project through the continued drilling and testing of satellite targets and optimizing efficiencies on select capital costs.

      The study was prepared for Montage by Lycopodium Minerals Pty Ltd. Other discipline specific consultants were:

      Mineral Resource Estimate:

      Matrix Resource Consultants Pty Ltd.

      Metallurgical Testwork:

      SGS Lakefield

      Metallurgical oversight:

      MPH Minerals Consultancy Ltd.

      Tailings and Water Storage:

      Knight Piésold Pty Ltd.

      Hydrogeology:

      Australasian Groundwater & Environmental Consultants

      Environment:

      Mineesia Ltd.

      Mineral Reserve Estimate & Mining:

      Carci Mining Consultants Ltd

      Key Differences in Project Scope Compared to 2022 DFS

      As part of the recent feasibility review and process, several areas of the Project were re-evaluated:

      • The mine plan now incorporates the mining of the Koné South and Gbongogo Main pits simultaneously at the start of operations to maximise grade and economics during the payback period.
      • The power will now be supplied via a grid connection. This change was made due to the lack of reliable LNG supplies in the country and the high cost of importing LNG.

      Figure 3: Koné Gold Project Site Layout

      Mining

      Mining operations will be carried out by a contractor on a unit cost per tonne basis utilising a mining fleet comprised of 90t rigid body haul trucks with suitably sized loading units at a rate of 39Mtpa at Koné and 15Mtpa at Gbongogo Main, respectively. The grade of the processed material in the first eight years is enhanced by using an elevated cut off grade to the plant and stockpiling the lower grade material for later processing.

      Pit optimizations were completed based on slope angle recommendations from SRK Consulting:

      • for Koné South 48° for oxide, 68° for transition and 68° for fresh rock; the overall slope angle inclusive of ramps and berms is approximately 55°.
      • for Gbongogo Main 32° for oxide, 40° for transition, and from 43° to 55° for fresh rock, which is reduced in areas of unfavourable bedding to 35°; the overall slope angle inclusive of ramps and berms is approximately 43°.

      The optimizations were run using estimates of processing cost and recovery data for each domain. Mining costs were broken into base and incremental mining costs, derived from competitive bids received from West African mining contractors.

      A gold price of $1,550/oz was used for the optimisation along with the following royalty assumptions: i) a sliding scale royalty payable to the government of Côte d'Ivoire, 4.0% at $1,550/oz Au; ii) a 2% property royalty; and iii) a 0.5% community development fund royalty.

      Pit designs (Figure 4 and Figure 5) were completed for the Koné and Gbongogo Main deposits which will be exploited through three pits, a smaller Northern pit which reaches a depth of 70m, a larger Southern pit which extends to a depth of 495m, and the Gbongogo Main pit which extends to a depth of 220m.

      The overall strip ratio of the Project is 1.18:1; the Koné South, Koné North and Gbongogo Main pits have strip ratios of 1:01, 1.19 and 3.77, respectively.

      Figure 4 – UFS Koné South Pit Design

      Figure 5 – UFS Gbongogo Main Pit Design

      Figure 6 shows the mine schedule and Figure 7 shows the processing schedule with the higher-grade feed material being processed during the first eight years of the mine life. Stockpiled lower grade material will be processed after the completion of mining operations.

      Figure 6 – Mining Schedule

      Figure 7 – Processing Schedule

      Figure 8 shows forecasted gold production and processing recoveries. The Koné South pit will be used for the deposition of tailings generated during the last 7 years of processing.

      Figure 8 – Annual Gold Production and Recoveries

      Metallurgy

      A comprehensive testwork program was carried out by SGS Lakefield on 68 comminution and 146 leach optimization and variability samples representing a range of material and rock types at the Koné and Gbongogo Main deposits.

      The testwork program demonstrated that the mineralization is amenable to direct tank carbon in pulp cyanide leaching with good gold recoveries, low reagent consumptions and medium-low resistance to grinding, providing favourable processing economics and a simple flowsheet.

      Table 8 shows the forecast gold recoveries and reagent consumptions at the average LOM grades. Forecast gold recoveries were estimated based on variable residue grades related to feed grade, a solution loss of 0.005mg/l gold and carbon fines loss of 0.15%.

      Cyanide consumption is low to very low and lime consumption is low for the dominant fresh material (90%), but higher for the less dominant transition (4%) and oxide (6%) zones.

      Table 9 shows the comminution results. The fresh mineralization is soft in terms of resistance to ball milling and crushing with medium abrasivity. A full suite of High-Pressure Grinding Rolls (HPGR) testing has been completed on a Koné Fresh ore sample and Static Pressure Testing two Koné Footwall Fresh ore samples. The (HPGR) investigation included: batch testing and a locked-cycle test, the Bond ball mill grindability test on both the HPGR feed and HPGR product and the SPT test. The HPGR test results have been supplemented by Semi Autogenous Grinding (SAG) mill test data in the design of the HPGR.

      Table 8 – Metallurgical Testwork Summary

      Samples
      Tested

      Domain

      LOM Plant Feed

      Average LOM Grade

      Forecast Recovery

      Cyanide

      Consumption

      Lime Consumption

      (Mt)

      (Au g/t)

      ( %)

      (kg/t)

      (kg/t)

      53

      Koné South Fresh

      129.5

      0.69

      89.1

      0.22

      0.47

      12

      Koné North Fresh

      0.4

      0.51

      77.1

      0.23

      0.45

      8

      Gbongogo Main Fresh

      9.4

      1.46

      86.1

      0.42

      0.55

      13

      Koné South FW Fresh

      15.8

      0.58

      87.7

      0.23

      0.45

      17

      Koné South Transition

      7.0

      0.60

      91.3

      0.18

      0.99

      5

      Koné North Transition

      0.4

      0.44

      88.0

      0.35

      0.75

      4

      Gbongogo Main Transition

      0.5

      1.09

      91.2

      0,21

      1.06

      21

      Koné South Oxide

      9.6

      0.59

      93.9

      0.18

      2.50

      9

      Koné North Oxide

      0.9

      0.47

      93.2

      0.13

      2.79

      4

      Gbongogo Main Oxide

      0.7

      1.36

      92.8

      0.29

      2.6

      130

      All Domains

      174.3

      0.72

      89.0

      0.24

      0.62

      Table 9 – Comminution Testwork for Fresh Rock

      Test

      Samples Tested

      Units

      Average

      SGS Lakefield Classification

      Bond Ball Mill Work Index

      68

      kWh/t

      10.7

      Soft

      SAG Milling Index

      68

      A x b

      59.6

      Moderate

      HPGR (HPi)

      2

      kWh/t

      13.2

      Medium

      Crusher Work Index

      14

      kWh/t

      15.8

      Medium

      Abrasion Index

      18

      g

      0.4

      Medium

      Process Plant

      The process plant design is based on a simple and robust metallurgical flowsheet designed for optimal precious metal recovery. The key design criteria for the plant are:

      • Nominal throughput of 11.0 Mtpa with a grind size of 80% passing (P80) 75 µm.
      • Process plant availability of 91.3% supported by the selection of standby equipment in critical areas.
      • The treatment plant design incorporates the following unit process operations:
        -  Primary and closed-circuit secondary crushing using a gyratory crusher and two cone crushers to produce a crushed product size P80 of approximately 31mm.
        -  A crushed feed stockpile with a nominal live capacity of 22,000 wet tonnes, providing buffer storage of crushed ore with continuous reclaim feeders for the HPGR-ball mill comminution circuit.
        -  Two parallel HPGRs in closed circuit with wet sizing screens, with undersize slurry reporting to the milling circuit via the cyclone feed hopper. Two parallel trains of ball mills in closed circuit with hydrocyclones to produce a grind size of P8075 µm.
        -  Pre-leach thickening to increase the slurry density feeding the leach and carbon in pulp ("CIP") circuit to minimise tankage and reduce overall reagent consumption.
        -  Leach circuit incorporating 14 leach tanks, arranged in two parallel trains of 7 each in series, to provide 36 hours leach residence time, and equipped with external oxygen contactors.
        -  A Kemix Pumpcell CIP circuit consisting of eight tanks for recovery of gold onto carbon, to minimize carbon inventory, gold in circuit and operating costs. The CIP and elution circuit design is based on daily carbon harvesting.
        -  20 tonne elution circuit, electrowinning and gold smelting to recover gold from the loaded carbon to produce a gold/silver doré.
        -  Tailings thickening to recover and recycle process water from the CIP tailings.
        -  Tailings pumping to the Tailings Storage Facility ("TSF").

      Project Infrastructure

      Haul Road from Gbongogo Main to Koné

      The Gbongogo haul road is 38.1 km in length and transverses a sparsely populated area between the two sites and has been designed to avoid villages, defined forest areas and minimise interactions with existing public roads. The road incorporates a pedestrian corridor leading to underpasses along the alignment. Access to the road will be restricted by construction of safety berms along the entire length of the road. Traffic control will be provided at all intersections with the public roads.

      The haul road alignment has been designed to limit the number of water courses impacted by the road with culverts provided at all main water intersections and a bridge to be constructed at the crossing of the Marahoué River.

      Water

      Water will be sourced from the nearby Marahoué river, from pit dewatering and a supplementary borefield.

      The river abstraction facility will be constructed adjacent to the Marahoué River bridge approximately 26 km north of the water storage facility ("WSF"). The extraction facility will comprise a sump to allow for harvesting of water by a pump mounted on a bridge support column. Pumping will only take place in the wet season, normally from June to December, provided minimum flows are met. Hydrological assessment of the river catchment indicates that the river will have sufficient excess flow during this period and will not affect downstream users.

      Harvested river water and pit de-watering will be pumped to an off-stream WSF. Surface runoff from the Koné mining area, ROM pad and stockpiles will gravity flow to the WSF. The WSF will have a capacity of approximately 7.2 million m3 and will enable accumulation of water during the wet season and a gradual drawdown in the dry season. In addition, water will be recycled from the tailings storage facility to the process water pond. Surface runoff from the Gbongogo mining area, will be collected in two sediment ponds and overflow to the Marahoué river following sediment settling.

      Tailings

      The TSF will comprise of a single cell confined by a cross valley embankment which will be raised annually until the mining in Koné South pit is completed early in year 9.

      The TSF basin will be lined with HDPE within the normal operating pond areas and a compacted soil liner elsewhere to reduce seepage. In addition, a system of underdrainage, embankment drainage and sub-liner drainage will be constructed to reduce seepage and aid consolidation of the tailings. Tailings will be deposited subaerially with the supernatant pond located away from the embankment. Water will be recovered from the supernatant pond by a suction pump with floating intake located in a channel excavated adjacent to an access causeway.

      Following the completion of the mining early in year 9, tailings will be deposited into the Koné South pit via four spigots located around the perimeter of the pit. Water will be extracted from the decant pond using floating intake lines to position the pumps above the pond elevation. The pond volume will be at its highest at the first year as the TSF pond will be pumped to the pit to let the TSF commence the closure process.

      The TSF will be closed and rehabilitated after deposition is transferred to the pit. Closure spillways will be formed to prevent water accumulating on the facilities and a waste rock cover will be placed over the tailings prior to topsoiling and revegetation.

      Power

      The UFS evaluated hybrid power supply options from proposals received from West African power providers. However, local supplies of LNG cannot be guaranteed and so power will now be supplied from the National Grid via a new 225kV transmission line.

      The Koné Gold Project process plant is estimated to have a maximum demand of 44.8 MW and an average annual demand of 37 MW, with an expected energy consumption of 303GWhr/yr.

      The capital cost estimate for grid connection is estimated to be $26M (before contingency). The operating cost is estimated at $0.1149/kWhr.

      Environmental

      Under the Mining Code, all applicants for an exploitation licence must submit an Environmental and Social Impact Assessment ("ESIA") to the Agence Nationale de L'Environment ("ANDE"), the authority in charge of supervising, validating and controlling environmental impact studies. Montage submitted the ESIA in December 2023. There are currently no objections to the development of the Project.

      Mining of the Koné North Pit will affect less than 10% of the Toudian Forest Reserve and discussions with the Ministry of Water and Forests have commenced to obtain authorization. The impact of the project on the forest reserve has been assessed during the ESIA. The UFS includes provision for the backfilling and re-habilitation of all but 14ha during operations. This will be complemented by a forest management plan in collaboration with relevant government agencies to ensure the upgrade and protection of the forest reserve.

      Permitting

      The development of the Project will be subject to the following permitting process:

      1. Approval of the ESIA by ANDE.
      2. Receipt of environmental approval of its design and environmental management program.
      3. Application for and receipt of a Mining Permit (valid for 10 years and then renewable).
      4. Negotiation of a Mining Convention.

      ANDE hosted a public enquiry in late December 2023 and expect environmental validation of the project to be completed in Q1 2024. In parallel with this process, Montage is preparing the Mining Permit application and initiating discussions in respect of the Mining Convention, all with assistance from local advisors. Based on current expectations, Montage believes it will receive final permits and approvals in Q3 of 2024.

      Capital Costs Summary

      Capital cost estimates are summarized in Table 10 and Table 11. The initial project capital cost is estimated at $712.1M, including a contingency allowance of $65.3M.

      Table 10 – Pre-Production Capital Cost Estimate Summary (Q4'23, +15/-10%)

      Main Area

      Koné

      Gbongogo

      Total

      ($M)

      ($M)

      ($M)

      Resettlement

      $7.4

      $2.0

      $9.4

      Camp

      $6.4

      -

      $6.4

      Pre-Production Mining

      $45.2

      $11.9

      $57.1

      Gbongogo Haul Road

      -

      $27.4

      $27.4

      Gbongogo Surface Water

      -

      $3.3

      $3.3

      Grid Connection

      $26.1

      -

      $26.1

      Process Plant

      $338.4

      -

      $338.4

      Infrastructure

      $26.5

      -

      $26.5

      Tailings and Water Storage

      $55.0

      -

      $55.0

      EPCM

      $46.4

      -

      $46.4

      Owners Costs

      $49.3

      $1.4

      $50.7

      Subtotal

      $600.8

      $46.0

      $646.8

      Contingency

      $61.3

      $4.0

      $65.3

      Grand Total

      $662.1

      $50.0

      $712.1

      Compared to the 2022 DFS and excluding capital costs associated with Gbongogo Main, the Koné pre-production capital cost has increased by $118.3M (including contingency). The significant increases are in the following areas:

      • Grid connection

      $28M

      • HPGR and ball mills 

      $24M

      • Owners' costs 

      $19M

      • Reagent supply  

      $7M

      • EPCM 

      $7M

      • WSF design upgrade 

      $4M

      • Feed preparation  

      $3M

      • General inflation    

      $24M

      The Gbongogo Main infrastructure costs add a further $50.0M.

      The duration of the detailed design and construction phase of the Project has been estimated to be 31 months commencing with the construction of the Marahoué bridge, road and pump station and the WSF. The plant is estimated to take 27 months to construct. Mining will commence 12 months prior to start of processing.

      The total LOM capital cost is estimated at $877.4M, including sustaining capital and closure costs of $165.3M, as shown in Table 11.

      Table 11 – Sustaining Capital Cost Estimate Summary (Q4'23, +15/-10%)

      Main Area

      Value ($M)

      Camp

      $4.4

      Tailings Storage Facility

      $65.0

      Process Plant

      $34.4

      Closure

      $61.6

      Grand Total

      $165.3

      Sustaining capital estimates have decreased by $126.4M compared to the 2022 DFS, primarily due to the change in power supply from LNG to a grid connection.

      Taken as a whole, these changes have resulted in a $65/oz increase in LOM AISC¹ versus the 2022 DFS.

      Operating Costs Summary

      Contract open pit mining costs were derived from a tender process involving several West African mining contractors who were provided a detailed mining plan for the Koné and Gbongogo Main deposits. The average open pit operating cost ($/t mined) is shown in Table 12. A diesel price of $1.00/l was used.

      Table 12 – Mining Costs (Q4'23)

      Ore

      Waste

      Total

      ($/t)

      ($/t)

      ($/t)

      Average

      $3.49

      $2.86

      $3.22

      Process operating costs have been developed for each major domain. Operating costs were developed using the plant parameters specified in the process design criteria. Table 13 presents the operating cost summary by material type. In addition to the processing costs, rehandle costs equate to $0.59/t processed when averaged over the LOM.

      Table 13 – Process Operating Cost per Material Type (Q4'23, +15/-15%)

      Annual Fixed
      Processing Costs

      Variable Processing
      Costs ($/t)

      Total

      ($M/y)

      Oxide

      Transition

      Fresh

      Fixed + Variable ($/t)

      Average

      $19.3

      $5.42

      $5.65

      $6.71

      $8.35

      Total fixed mine level general and administration ("G&A") costs are estimated at $12.1M annually, which are in addition to the $19.3M in annual fixed processing costs shown in Table 13.

      Table 14 shows the LOM total cash cost¹ and all-in sustaining costs¹ calculated both on a $/payable ounce and $/tonne processed basis. Pre-production capitalized mining costs are excluded from these calculations.

      Table 14 – Cash Cost and Unit Cost Summary (using $1,850/oz gold price)

      Description

      LOM Total

      LOM Avg.

      LOM Avg.

      ($M)

      ($/payable oz)

      ($/t processed)

      Operating Cost




      Mining

      $1,164

      $326

      $6.68

      Road Haulage

      $68

      $19

      $0.39

      Processing

      $1,456

      $408

      $8.35

      Rehandle

      $103

      $29

      $0.59

      G&A

      $171

      $48

      $0.98

      Royalties

      $495

      $139

      $2.84

      Total Cash Cost¹

      $3,457

      $969

      $19.83

      Sustaining Capital

      $104

      $29

      $0.60

      All-in Sustaining Costs¹

      $3,561

      $998

      $20.42

      Financial Analysis

      An economic analysis has been carried out for the Project using a cash flow model. The model has been constructed using annual cash flows taking into account annual processed tonnages and grades for the CIP feed, process recoveries, metal prices, operating costs and refining charges, royalties and capital expenditures (both initial and sustaining). A payable factor of 99.90% has been assumed for purposes of gold sales.

      The financial analysis used a base price of $1,850 per ounce. The financial assessment of the Project is carried out on a "100% equity" basis and the debt and equity sources of capital funds are ignored. No provision has been made for the effects of inflation. Côte d'Ivoire tax regulations are applied to assess the tax liabilities (corporate tax rate of 25%), duties and other levies. Discounting and IRR calculations has been applied from the first year of operations using a 5% discount rate and pre-production capital is deducted on an undiscounted basis. A detailed annual summary cash flow model is provided in Appendix 1 of this release.

      Sensitivity Analysis

      Table 15 shows the Project sensitivity of the NPV, IRR, Cash Cost and AISC with gold price.

      Table 15 – Project Sensitivity

      Gold Price ($/oz)

      Metric

      Units

      $1,650

      $1,750

      $1,850*

      $1,950

      $2,050

      NPV5%

      $M

      721

      905

      1,089

      1,273

      1,456

      IRR

      %

      22.6 %

      26.9 %

      31.0 %

      35.2 %

      39.3 %

      Total Cash Cost1

      $/payable oz

      954

      962

      969

      977

      984

      AISC1

      $/payable oz

      983

      991

      998

      1,006

      1,013

      Payback

      years

      3.2

      2.8

      2.6

      2.3

      2.2

      * Three-year trailing average

      Opportunities

      Potential opportunities to improve the economics of the Koné Gold Project have been identified:

      • The wider Koné Gold Project of 2,259 sq.km hosts over 100km strike extent of regional scale mineralised structures which are underexplored. These areas have the potential through further exploration to add satellite deposits to the current mine life.
      • Continue discussions with contractors to look to achieve capital cost reductions.
      • Continue to engage with stakeholders to maintain ease of Project implementation.

      Koné Gold UFS Live Webcast

      A conference call and webcast will be held on Friday, January 19, 2024, starting at 11:00am Eastern Time to discuss the Updated Feasibility Study on the Koné Gold Project. To participate in the conference call, use the following dial-in numbers and conference ID, or join the webcast using the link below:

      International: +1 (416) 764-8659

      North American Toll-Free: +1 (888) 664-6392

      Conference ID: 39004138

      Webcast URL: https://app.webinar.net/91Av7DERlpD

      Notes:

      1. Cash costs per payable ounce of gold and per tonne processed, AISC per payable ounce of gold sold and per tonne processed are non-GAAP financial measures. Please see "Cautionary Note Regarding Non-GAAP Measures". AISC per payable ounce includes all mining costs, processing costs, mine level G&A, royalties, and sustaining capital and is adjusted to reflect movements in stockpiles. Cash costs per payable ounce includes all mining costs, processing costs, mine level G&A, and royalties and is adjusted to reflect movements in stockpiles.

      ABOUT MONTAGE GOLD CORP.

      Montage is a Canadian-based precious metals exploration and development company focused on opportunities in Côte d'Ivoire. The Company's flagship property is the Koné Gold Project, located in northwest Côte d'Ivoire, which currently hosts a Probable Mineral Reserve of 174.3 Mt grading 0.72g/t for 4.01M ounces of gold. The Company released the results of a UFS on the Koné Gold Project on January 16, 2024, outlining a 16-year gold project producing 3.57M ounces of gold at AISC of $998 per ounce over the life of mine, with average annual production of 223koz, and peak annual production of 378koz. Montage has a management team and Board with significant experience in discovering and developing gold deposits in Africa.

      The Koné and Gbongogo Main Mineral Resource Estimates were carried out by Mr. Jonathon Abbott of Matrix Resource Consultants of Perth, Western Australia, who is considered to be independent of Montage Gold. Mr. Abbott is a member in good standing of the Australian Institute of Geoscientists and has sufficient experience which is relevant to the commodity, style of mineralization under consideration and activity which he is undertaking to qualify as a Qualified Person under NI 43–101.

      The Mineral Reserve Estimate was carried out by Ms. Joeline McGrath of Carci Mining Consultants Ltd., who is considered to be independent of Montage Gold. Ms. McGrath is a member in good standing of the Australian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the work which she is undertaking to qualify as a Qualified Person under NI 43–101.

      QUALIFIED PERSONS STATEMENT

      The technical contents of this release have been approved by the following Qualified Persons pursuant to National Instrument 43-101:

      • Sandy Hunter: Lycopodium Minerals Pty Ltd.
      • Jonathon Abbott: Consulting Geologist, Matrix Resource Consultants
      • Mike Hallewell: Consultant, MPH Minerals Consultancy Ltd.
      • Pieter Labuschagne: Consultant, Australasian Groundwater & Environmental Consultants
      • Carl Nicholas: Consultant, Mineesia Ltd.
      • Joeline McGrath: Consultant, Carci Mining Consultants Ltd
      • Tim Rowles: Consultant, Knight Piésold Pty Ltd.

      TECHNICAL DISCLOSURE

      Data verification programs have included review of QA/QC data, re-sampling and sample analysis programs, and database verification. Validation checks were performed on data, and comprise checks on surveys, collar co-ordinates and assay data. Sufficient verification checks were undertaken on the database to provide confidence that the database is virtually error free and appropriate to support Mineral Resource and Reserve estimation.

      A technical report for the Koné Gold Project will be prepared in accordance with National Instrument 43-101 and will be filed on SEDAR at www.sedar.com and on the Company's website at www.montagegoldcorp.com within 45 days of this press release. Readers are encouraged to read the technical report in its entirety, including all qualifications, assumptions and exclusions that relate to the details summarized in this press release. The technical report is intended to be read as a whole, and sections should not be read or relied upon out of context.

      Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

      TECHNICAL DISCLOSURE – SAMPLING AND ASSAYING

      The technical contents of this press release relating to exploration results have been approved by Hugh Stuart, BSc, MSc, a Qualified Person pursuant to NI 43-101. Mr. Stuart is the President of the Company, a Chartered Geologist and a Fellow of the Geological Society of London.

      Samples used for the results described have been prepared and analysed by fire assay using a 50-gram charge at the Bureau Veritas facility in Abidjan, Côte d'Ivoire or the SGS facility in Yamoussoukro, Côte d'Ivoire. Shallow RC reconnaissance results are based on 3 metre composite samples. Field duplicate samples are taken, and blanks and standards are added to every batch submitted. QA/QC has been approved in line with industry standards and interpretations reviewed the Qualified Person.

      FORWARD LOOKING STATEMENTS

      This press release contains certain forward-looking information and forward-looking statements within the meaning of Canadian securities legislation (collectively, "Forward-looking Statements"). All statements, other than statements of historical fact, constitute Forward-looking Statements. Words such as "will", "intends", "proposed" and "expects" or similar expressions are intended to identify Forward-looking Statements. Forward looking Statements in this press release include statements related to the Company's mineral reserve and resource estimates; the timing and amount of future production from the Koné Gold Project; expectations with respect to the IRR, NPV, payback and costs of the Koné Gold Project; anticipated mining and processing methods of the Koné Gold Project; anticipated mine life of the Koné Gold Project; expected recoveries and grades of the Koné Gold Project; and timing for permits and concessions. Forward-looking Statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include uncertainties inherent in the preparation of mineral reserve and resource estimates and definitive feasibility studies such as the MRE and the UFS, including but not limited to, assumptions underlying the production estimates not being realized, incorrect cost assumptions, unexpected variations in quantity of mineralized material, grade or recovery rates, unexpected changes to geotechnical or hydrogeological considerations, unexpected failures of plant, equipment or processes, unexpected changes to availability of power or the power rates, failure to maintain permits and licenses, higher than expected interest or tax rates, adverse changes in project parameters, unanticipated delays and costs of consulting and accommodating rights of local communities, environmental risks inherent in the Côte d'Ivoire, title risks, including failure to renew concessions, unanticipated commodity price and exchange rate fluctuations, risks relating to COVID-19, delays in or failure to receive access agreements or amended permits, the impact and progression of the COVID-19 pandemic and other risk factors set forth in the Company's final prospectus under the heading "Risk Factors". The Company undertakes no obligation to update or revise any Forward-looking Statements, whether as a result of new information, future events or otherwise, except as may be required by law. New factors emerge from time to time, and it is not possible for Montage to predict all of them, or assess the impact of each such factor or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any Forward-looking Statement. Any Forward-looking Statements contained in this press release are expressly qualified in their entirety by this cautionary statement.

      NON-GAAP MEASURES

      This press release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards ("IFRS"), including cash costs and AISC per payable ounce of gold sold and per tonne processed. Non-GAAP measures do not have any standardized meaning prescribed under IFRS and, therefore, they may not be comparable to similar measures employed by other companies. The Company discloses "cash costs" and "all-in sustaining costs" because it understands that certain investors use this information to determine the Company's ability to generate earnings and cash flows for use in investing and other activities. The Company believes that conventional measures of performance prepared in accordance with IFRS, do not fully illustrate the ability of mines to generate cash flows. The measures, as determined under IFRS, are not necessarily indicative of operating profit or cash flows from operating activities. The measures cash costs and all-in sustaining costs are considered to be key indicators of a project's ability to generate operating earnings and cash flows. Non-GAAP financial measures should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS and are not necessarily indicative of operating costs, operating profit or cash flows presented under IFRS. Readers should also refer to our management's discussion and analysis, available under our corporate profile at www.sedar.com for a more detailed discussion of how we calculate such measures.

      Appendix 1 – Summary Production and Financial Model
      Appendix 2 – Listing of Intercept Detail for Diouma North

      Hole ID

      Drill Type

      Collar Location
      (UTM Zone 29N)

      Orientation

      Depth

      From

      To

      Length

      Uncut

      Au

      Grade Cut to 20g/t

      mE

      mN

      mRL

      Dip

      Azim


      (m)

      (m)

      (m)

      (g/t)

      (g/t)

      GBRC073

      RC

      769,712

      991,540

      339

      -55

      100

      52

      7

      21

      14

      1.73

      1.73

      GBRC074

      RC

      769,516

      991,429

      343

      -55

      100

      108

      No significant intercept

      GBRC075

      RC

      769,574

      991,419

      343

      -55

      100

      114

      No significant intercept

      GBRC076

      RC

      794,703

      1,017,177

      399

      -55

      125

      126

      96

      106

      10

      0.79

      0.79

      121

      124

      3

      3.26

      3.26

      GBRC082

      RC

      769,615

      991,882

      338

      -55

      90

      114

      14

      27

      13

      0.89

      0.89

      GBRC087

      RC

      769,578

      991,440

      344

      -55

      100

      162

      3

      8

      5

      0.89

      0.89

      GBRC090

      RC

      769,657

      991,607

      339

      -55

      100

      80

      50

      57

      7

      0.74

      0.74

      GBRC091

      RC

      769,598

      991,618

      341

      -55

      100

      162

      81

      89

      8

      1.34

      1.34

      100

      106

      6

      0.93

      0.93

      GBRC092

      RC

      769,624

      991,653

      340

      -55

      100

      150

      45

      48

      3

      1.08

      1.08

      75

      78

      3

      1.70

      1.70

      GBRC093

      RC

      769,670

      991,648

      338

      -55

      100

      100

      40

      46

      6

      2.28

      2.28

      GBRC094

      RC

      769,678

      991,694

      339

      -55

      100

      110

      14

      20

      6

      0.79

      0.79

      GBRC095

      RC

      769,633

      991,700

      340

      -55

      100

      150

      No significant intercept

      GBRC096

      RC

      769,573

      991,677

      341

      -55

      100

      100

      No significant intercept

      GBRC099

      RC

      769,544

      991,466

      344

      -55

      100

      162

      No significant intercept

      GBRC100

      RC

      769,610

      991,410

      344

      -55

      100

      120

      8

      14

      6

      1.59

      1.59

      GBDDH062

      Core

      769,642

      991,552

      343

      -55

      100

      104.7

      58.00

      72.00

      14.00

      2.16

      2.16

      77.00

      82.00

      5.00

      0.85

      0.85

      85.00

      88.10

      3.10

      1.99

      1.99

      GBDDH063

      Core

      769,630

      991,576

      342

      -55

      100

      143.7

      88.00

      91.50

      3.50

      3.23

      3.23

      GBDDH064

      Core

      769,690

      991,578

      341

      -55

      200

      176.7

      43.00

      46.00

      3.00

      3.84

      3.84

      78.85

      96.30

      17.45

      2.74

      2.16

      127.00

      138.00

      11.00

      2.21

      2.21

      SOURCE Montage Gold Corp

      Modal title

      Contact PR Newswire

      • Call PR Newswire at 888-776-0942
        from 8 AM - 9 PM ET
      • Chat with an Expert
      • General Inquiries
      • Editorial Bureaus
      • Partnerships
      • Media Inquiries
      • Worldwide Offices

      Products

      • Explore Our Platform
      • Plan Campaigns
      • Create with AI
      • Distribute Press Releases
      • Report Results
      • Amplify Content

      About

      • About PR Newswire
      • About Cision
      • Careers
      • Accessibility Statement
      • APAC
      • APAC - Simplified Chinese
      • APAC - Traditional Chinese
      • Brazil
      • Canada
      • Czech
      • Denmark
      • Finland
      • France
      • Germany
      • India
      • Indonesia
      • Israel
      • Italy
      • Japan
      • Korea
      • Mexico
      • Middle East
      • Middle East - Arabic
      • Netherlands
      • Norway
      • Poland
      • Portugal
      • Russia
      • Slovakia
      • Spain
      • Sweden
      • United Kingdom
      • Vietnam

      My Services

      • All New Releases
      • Platform Login
      • Data Privacy

      Do not sell or share my personal information:

      • Submit via [email protected] 
      • Call Privacy toll-free: 877-297-8921

      Contact PR Newswire

      Products

      About

      My Services
      • All News Releases
      • Platform Login
      • ProfNet
      Call PR Newswire at
      888-776-0942
      • Terms of Use
      • Privacy Policy
      • Information Security Policy
      • Site Map
      • RSS
      • Cookies
      Copyright © 2026 Cision US Inc.