Data Center Construction Market Growing at 10% CAGR to 2019 in Terms of Revenue
DALLAS, May 20, 2015 /PRNewswire/ --
Global Data Center Construction Market 2015-2019 research report says IoT, cloud computing and big data analytics usage are primary data center construction market growth drivers during the forecast period to 2019.
Complete report on data center construction market spread across 187 pages, providing analysis of 17 major companies and supported with 68 exhibits is now available at http://www.reportsnreports.com/reports/354208-data-center-construction-market-global-report-analysis-and-forecast-2015-2019.html .
The data center construction market covers multiple sectors like design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities. Internet of things (IoT), which requires a data center, is experiencing tremendous growth. Data centers are more suitable for storing and processing data generated by devices connected to the internet, and also to meet the demand for real-time computing. Therefore, the market is set to witness an increase in data centers that are reliable and scalable in nature. The growing demand for cloud computing and big data analytics are also assumed to have an impact on this market, thereby driving the growth of the Global Data Center Construction market during the forecast period. Most modern data center facilities are seeking Power Usage Effectiveness (PUE) and Leadership in Energy and Environmental Design (LEED) certification before commencing construction of their facilities.
The data center construction market in GCC countries is expected to grow significantly because of certain emerging trends that are expected to have a positive influence on the market during the forecast period. Green Data Center is a trend that is gaining increased attention and will propel the growth of the market during the forecast period. A green data center should comprise better PUE and should aid in reducing the environmental effects of a facility. A data center is currently designed by considering components that support the environment, as well as business operations in an efficient manner. LEED certification is used to determine whether a constructed facility satisfies the needs of a company. Software defined data center is a trend that has started to gain traction. Thus, the combination of drivers and trends is expected to propel the market growth during the forecast period.
Companies mentioned in this data center construction market report include AECOM, Arup, Corgan, DPR Construction, Fluor, Gensler, HDR, Holder Construction, ISG, Jacobs Engineering Group Inc., Jones Engineering Group, Nakano, Schneider Electric, SISk Group, Sweett Group, Syska Hennessy Group and Turner Construction. The other prominent vendors include CPG Corporation, CSF Group, Drake & Scull International, DSCO Group, Edarat Group, Fortis Construction, Gilbane, Hensel Phelps, HITT Contracting, Integrated Design Group, JE Dunn Construction, Kienta Group, Kinetics Corporate, Kirby Group, KKR, M+W group, McGough, McLaren Group, Mercury Engineering, Mercury MENA, Merrick & Co, Mortenson Construction, Nova Corporation, PageSoutherlandPage, Pepper Construction, PM Group, PTS, PWS (Malaysia), Red Engineering, Sara-Timur, Sato Kogyo, Skanska, Structure Tone, The Whiting-Turner Contracting, The Whiting-Turner Contracting, URS, Wah Loon Engineering. Order a copy of the global data center construction market report for 2015 to 2019 at http://www.reportsnreports.com/Purchase.aspx?name=354208 .
The Global Data Center Construction market is facing some serious challenges. One of them is the lack of expertise in designing and constructing a data center. There are several considerations involved in constructing a data center and very particular expertise to implement each and every task is important. This knowledge fall under the categories of construction, design, engineering, project management and many more. Data center construction is highly dependent on the business requirement that combines both present and future needs. Experience in converting business needs to IT infrastructure development will play a critical role in the construction of these facilities. Inadequate analysis of the requirements of an organization will result in improper construction of data centers, which results in increased CAPEX and OPEX.
To calculate the data center construction market size, the report considers revenue generated from new data center construction and renovation of data centers as well as capital expenditure used for electrical, mechanical, and general construction. Level of service offered by a data center facility can be identified based on tier systems. Every constructed data center has a tier ranking of 1-4, which is categorized based on its physical infrastructure, cooling, power, promised uptime and redundancy levels. Data center tier system was introduced in 2005, which is developed and maintained by TIA. These four tier levels were developed by the Uptime Institute. Tier classification is done by Uptime Institute, to identify whether a constructed data center facility satisfies the business requirements.
Data Center Construction Market information by Geographical Segmentation provided in this research cover United States, Western Europe, SEA, China, Latin America, India, GCC and RoW (Rest of the World). Other Sections Include an Analysis on the Following:
- Top three Drivers and its Impact on the Data Center Construction Market
- Top three Challenges and its Impact on the Data Center Construction Market
- Top three Trends and its Impact on the Data Center Construction Market
- Five Forces Analysis of the Data Center Construction Market
- SWOT Analysis of Key Vendors Data Center Construction Market
This is a premium research report on the worldwide data center construction market. It is priced at US$3500 for a single user PDF. Have Questions on this research? Get them answered via http://www.reportsnreports.com/Purchase.aspx?name=354208 .
On the same topic, ReportsnReports.com has other newly published researches titled:
- Data Center Construction Market in GCC Countries 2015-2019
- Data Center Construction Market in the US 2015-2019
- Data Center Construction Market in Latin America 2015-2019
Another research report titled Data Center Construction Market by Data Center Types (Colocation, Enterprise, Telecom), by Design Types (Electrical, Mechanical), and by Tier Types (Tier 1, Tier 2, Tier 3, Tier 4) - Global Forecast to 2019 is spread across 220 pages says the Information Technology (IT) vertical is expected to hold the largest market share of the total datacenter construction market throughout the forecast period of 2014 to 2019 followed by Banking, Financial Services and Insurance (BFSI) vertical. There are huge business opportunities in the Asia-Pacific region, due to presence of emerging economies in this region. However, there is growing trend of providing colocation facilities by vendors in this market. Companies like Aecom Technology Corp., Skanska AB, Jacobs Engineering Group, Inc., Arcadis NV, Balfour Beatty PLC, IBI Group Inc., Fluor Corporation, URS Corporation, Hochtief AG and Gilbane Inc. are profiled in this report available at http://www.reportsnreports.com/reports/300723-data-center-construction-market-by-data-center-types-colocation-enterprise-telecom-by-design-types-electrical-mechanical-and-by-tier-types-tier-1-tier-2-tier-3-tier-4-global-forecast-to-2019.html .
Explore more reports related to IT and Telecommunications market at http://www.reportsnreports.com/market-research/information-technology/ .
About Us:
ReportsnReports.com is an online market research reports library of 500,000+ in-depth studies of over 5000 micro markets. Not limited to any one industry, ReportsnReports.com offers research studies on agriculture, energy and power, chemicals, environment, medical devices, healthcare, food and beverages, water, advanced materials and much more.
Connect With Us on:
Facebook: https://www.facebook.com/pages/ReportsnReports/191441427571689
LinkedIn: http://www.linkedin.com/company/reportsnreports
Twitter: https://twitter.com/marketsreports
G+ / Google Plus: https://plus.google.com/111656568937629536321/posts
Pinterest: http://www.pinterest.com/comeonseo/reportsnreports/
RSS/Feeds: http://http://www.reportsnreports.com/feed/l-latestreports.xml
Contact:
Ritesh Tiwari
TX, Dallas North - Dominion Plaza,
17304, Preston Road,
Suite 800, Dallas 75252
Tel: +1-888-391-5441
[email protected]
SOURCE ReportsnReports
Share this article